> News Article

MPB secures 3 bridge packages for Network Rail

Posted 20/07/2011

Package 602 is a £2.8m design and build package involving the reconstruction of four bridges. The proposed works consist of two under bridge replacements with steel U-deck structures using self-propelled modular transporters, the reconstruction of a large underline culvert with precast concrete beams and an ambitious two span over bridge re-construction on an arterial road in Stockport with the main works being completed within a 1 week road closure.

© Copyright MPB 2017 All Rights Reserved. Terms & Conditions
Site by Verto