History

Quality from the Ground Up: The MPB Story

From our origins on the concrete gangs of Britain’s mid-century infrastructure to our position today as one of the UK’s premier structural concrete and civil engineering specialists, the MPB journey has been defined by quality, resilience, and an unwavering work ethic.

Today, we combine an extraordinary heritage of landmark structural deliveries with forward-thinking technical innovation. Operating from our headquarters in Corby alongside regional hubs in London, Birmingham, and Manchester, we bring flexible, reliable expertise to the nation’s most complex infrastructure, making high-profile projects happen with absolute confidence.

The Vision and Grit of Michael “The Horse” Boyle

MPB Structures was built on the fierce determination of our late founder, Michael John “Mick” Boyle, who passed away peacefully in May 2026 at the age of 89. A native of Kilraine, Glenties, Mick was a “very, very proud Donegal man” whose humility and relentless drive became the cornerstone of our company values.

His journey in construction began under incredibly daunting circumstances. At just 15 years old, he emigrated from the hills of Glenties to the Scottish Borders to join his uncle in dry stone walling, living in a basic seasonal worker’s bothy. Mick later moved to the gruelling concrete gangs of Sir Robert McAlpine, working alongside fellow Donegal men on some of the UK’s defining post-war engineering projects, including Hinkley Point 1 Power Station, the Humber Bridge, and the Scunthorpe Steelworks. It was during these intense years that he earned his legendary industry moniker, “The Horse Boyle,” owing to his superhuman ability to drive high-production volumes of rebar and concrete. Throughout his early career, he proudly carried the operational titles of a “McAlpine Fusilier” and a “Kishorn Commando”.

Mick’s reputation as a tenacious leader and master negotiator was solidified in 1976 when he was promoted to manage 1,200 men in the construction of the Ninian Central Oil Rig at Kishorn on the west coast of Scotland. At the time, this massive project was the largest concrete structure in the world, and Mick’s absolute devotion to delivering it safely and on time cemented his legacy.

In his early 50s, Mick took the brave leap to establish his own company, founding MPB Structures in 1987 and over the course of his career, he contributed to major landmark projects but at the heart of Mick’s vision was a simple belief: put people first. He was deeply committed to supporting his workforce, creating opportunities, and maintaining the highest standards of health, safety and quality and today, his legacy lives on, guiding MPB Structures as we continue to deliver complex projects with the same integrity, ambition and care that he instilled from the very beginning.

Four Decades of Growth

Our Timeline Our historical trajectory showcases a steady, strategic scaling from specialised tactical packages to nationwide infrastructure dominance: 

1987
Started constructing cruise missile shelters at RAF Molesworth

Started constructing cruise missile shelters at RAF Molesworth

1987
1988
New Stansted Airport - Rapid Transit System Tunnel for Sir Alfred McAlpine

New Stansted Airport - Rapid Transit System Tunnel for Sir Alfred McAlpine

1988
1989
Canary Wharf Phase 1 starts for Christiani and Nielsen Construction - FC2,FC3,FC4

Canary Wharf Phase 1 starts for Christiani and Nielsen Construction - FC2,FC3,FC4

1989
1990
Press and Body Shop at the Toyota Burnaston Factory Derby - Lilley Construction Limited

Press and Body Shop at the Toyota Burnaston Factory Derby - Lilley Construction Limited

1990
1991
Sheffield Super Tram - construction of all RC Structures for Balfour Beatty

Sheffield Super Tram - construction of all RC Structures for Balfour Beatty

1991
1992
Manchester Metro link - Construction of RC structures for John Mowlem

Manchester Metro link - Construction of RC structures for John Mowlem

1992
1993
BP Harding Oil Platform at Hunterston - 25000tonne of Steelfixing for Costain Taylor Woodrow JV

BP Harding Oil Platform at Hunterston - 25000tonne of Steelfixing for Costain Taylor Woodrow JV

1993
1994
Docklands Light Railway - Beckton Extention for John Mowlem

Docklands Light Railway - Beckton Extention for John Mowlem

1994
1998
Fountain Park Development Edinburgh for Carillion

Fountain Park Development Edinburgh for Carillion

1998
2000
Glasgow Science Centre for Carillion

Glasgow Science Centre for Carillion

2000
2001
Radisson Blue Hotel for BAM Construction (formally HBG)

Radisson Blue Hotel for BAM Construction (formally HBG)

2001
2002
The Edge Development Manchester for Carillion/Countryside Properties value to MPB £8.5Million

The Edge Development Manchester for Carillion/Countryside Properties value to MPB £8.5Million

2002
2003
M77 Motorway Bridges Construction - 21 RC Stuctures for Wimpey/Carillion

M77 Motorway Bridges Construction - 21 RC Stuctures for Wimpey/Carillion

2003
2004
Westfield Derby Shopping Centre - Groundworks and RC Works value £17Million

Westfield Derby Shopping Centre - Groundworks and RC Works value £17Million

2004
2005
Beetham Hilton Tower - 157Metre tower, faster floor programme in UK 4 days per floor, concrete Society Winning Building Category

Beetham Hilton Tower - 157Metre tower, faster floor programme in UK 4 days per floor, concrete Society Winning Building Category

2005
2006
West Tower Liverpool - 40 storey building, tallest building in Liverpool at 140 metres for Carillion

West Tower Liverpool - 40 storey building, tallest building in Liverpool at 140 metres for Carillion

2006
2007
Westfield Stratford Shopping Centre - Groundworks and RC Works value £25 Million

Westfield Stratford Shopping Centre - Groundworks and RC Works value £25 Million

2007
2008
Media City for Lendlease value to MPB £20million - Concrete and RC Frames

Media City for Lendlease value to MPB £20million - Concrete and RC Frames

2008
2009
Broadcasting Tower Leeds - 70metre tower for Downing Construction - World's best Tall Building 2010

Broadcasting Tower Leeds - 70metre tower for Downing Construction - World's best Tall Building 2010

2009
2010
New Street Station started for Network Rail/MACE £25Million package to MPB

New Street Station started for Network Rail/MACE £25Million package to MPB

2010
2011
Crossrail C350 Pudding Mill Lane Contract award from Morgan Sindall £28Million package value

Crossrail C350 Pudding Mill Lane Contract award from Morgan Sindall £28Million package value

2011
2012
MPB Win Cramlington Emergency Care Centre for Lendlease

MPB Win Cramlington Emergency Care Centre for Lendlease

2012
2013
MPB commence works on University of Nottingham Science Library for Galliford Try

MPB commence works on University of Nottingham Science Library for Galliford Try

2013
2014
MPB commence on Royal Arsenal Riverside for Berkeley Homes in Woolwich

MPB commence on Royal Arsenal Riverside for Berkeley Homes in Woolwich

2014
2015
MPB secure HSBC Headquarters in Birmingham for Galliford Try - Package Value £10Million

MPB secure HSBC Headquarters in Birmingham for Galliford Try - Package Value £10Million

2015
2016
MPB Record Turnover of £92 Million still in UK top 10

MPB Record Turnover of £92 Million still in UK top 10

MPB Win Stake TFL 5 year framework for London Underground Works

MPB secure Battersea Power Station from Skanska/BPSDC South Side

2016
2017
MPB Celebrate 30 Successful Years in Trading

MPB Celebrate 30 Successful Years in Trading

2017
2019
Record Turnover of £120 Million Reached

Record Turnover of £120 Million Reached

2019
2021
MPB WINS FIRST MAJOR HS2 Package

MPB WINS FIRST MAJOR HS2 Package

2021
2022
MPB wins 'First Street, Manchester' Project, surpassing all previous order value records.

MPB wins 'First Street, Manchester' Project, surpassing all previous order value records.

2022
2023
MPB wins major HS2 packages at Saltley and Washwood Heath in Birmingham.

MPB wins major HS2 packages at Saltley and Washwood Heath in Birmingham.

2023
2024
MPB commits to a 5-year training model that will deliver £5m of social value back into the industry.

MPB commits to a 5-year training model that will deliver £5m of social value back into the industry.

2024
2025
MPB is awarded by Balfour Beatty Vinci, the 'Delivery Partner of the Year' on HS2.

MPB is awarded by Balfour Beatty Vinci, the 'Delivery Partner of the Year' on HS2.

2025
2026
MPB secures the follow-on Structures package for HS2 Curzon Street Station in Birmingham, achieving our largest order value to date.

MPB secures the follow-on Structures package for HS2 Curzon Street Station in Birmingham, achieving our largest order value to date.

2026