Due to an existing strong relationship, Network Rail approached MPB to re-examine the challenge under a two stage ECI process. Working collaboratively with Network Rail’s design and delivery teams, MPB developed an alternative construction methodology, refined the structural design to improve buildability, and produced detailed planning for the blockade works, including sequencing, logistics, and contingency arrangements.
Through this early engagement, MPB were able to demonstrate a safe, efficient, and deliverable solution within the 101-hour possession window, enabling Network Rail to confidently proceed. MPB then negotiated the implementation contract and successfully delivered all works within the planned blockade, validating the robustness of the ECI approach and restoring confidence
in the programme.
The successful reconstruction of Orphanage Road bridge stands as a clear demonstration of the value of true early contractor involvement. By challenging constraints, optimising design, and rigorously planning every aspect of the 101‑hour blockade, MPB delivered a solution previously deemed unachievable. The project not only restored a vital route into Watford but also reinforced Network Rail’s confidence in an innovative, collaborative delivery model, showcasing MPB’s ability to de‑risk complex rail infrastructure works and deliver precisely when it matters most.
Collectively, these achievements showcase MPB’s skill in delivering demanding rail infrastructure works with expert management, assured execution, and dependable performance.
Services
Client
NETWORK RAIL
Location
EAST OF ENGLAND
Sector