New Fleet Delivery Marks Major Progress at Therme Manchester Site

MPB Structures has reached a significant operational milestone at the Therme Manchester development with the arrival of a new, high-performance machinery fleet. The delivery, part of a multi-million pound investment with Watling JCB, represents a vital step in the transition toward the main structural phase of the UK’s premier wellbeing resort.

The arrival of these state-of-the-art machines ensures that the TraffordCity site is fully equipped to manage the complex logistical and engineering requirements of the 28-acre project. The new fleet has been selected specifically for its efficiency and reliability, qualities essential for maintaining the rigorous construction schedule of the £500 million resort.

Enhanced Capacity for TraffordCity

The presence of the new machinery on-site allows MPB to accelerate the precision concrete works required for the resort’s unique pavilion-style architecture. Spanning an area equivalent to 28 football pitches, the project demands a high volume of heavy-duty equipment to manage the installation of intricate structural frameworks and large-scale thermal bathing facilities.

Key aspects of the development supported by this delivery include:

  • The creation of the UK’s largest indoor waterpark and sauna complex.
  • The structural foundation for over 25 water slides.
  • Development of the all-season urban beach and extensive public realm areas.
  • Groundwork for the on-site hydroponic farm and sustainable botanical gardens.

A Strategic Investment in Infrastructure

The deployment of this new equipment underscores MPB’s dedication to utilizing modern construction methods that prioritize both safety and productivity. By integrating the latest machinery into the site workflow, we are able to optimise performance while adhering to the strict environmental standards set out for the Therme Manchester project.

Patrick Boyle, Managing Director of MPB Structures, commented on the significance of the equipment arriving on-site:

“We are pleased to see this new machinery beginning its work at TraffordCity. MPB are delighted to support Watling JCB with this multi-million pound order, which ensures our teams have the very best tools at their disposal. This investment is fundamental to our ability to deliver the complex structural requirements of Therme Manchester to the highest possible standard.”

The Vision for Therme Manchester

As the project moves forward, the new fleet will be instrumental in realising the vision of a “world-class” wellness destination in the North West. Therme Manchester is designed to be more than a leisure attraction; it is a sustainable, biodiversity-led environment that incorporates air-source heat pumps and advanced water filtration systems.

With the machinery now operational on-site, MPB continues to lead the structural delivery of this landmark development, which is expected to bring thousands of jobs to the region and provide a transformative health and wellbeing resource for the United Kingdom.

MORE NEWS

MPB Structures Celebrates Rameesha Aamna’s Nomination for Young Site Manager of the Year
MPB Structures is exceptionally proud to announce that Rameesha Aamna has been shortlisted for the 'Young Site Manager of the Year' category at the highly anticipated Building the Future Awards 2026.
MPB Welcomes Government Announcement of 40,000 New Construction Placements
The Department for Business and Trade (DBT) recently unveiled plans to create up to 40,000 new construction placements annually. This initiative forms part of the wider Industrial Strategy of the government, which aims to generate over 100,000 job and training opportunities each year across the growth industries of Britain. MPB Structures Ltd is delighted to champion this announcement. It aligns perfectly with the talent development strategies we have already embraced and implemented across our multiple site locations.

send us a message

"*" indicates required fields