01536 264100 | info@mpb.co.uk

NEW PROJECT: THREE CHAMBERLAIN SQUARE

MPB is delighted to announce that they have been awarded a package by Sir Robert McAlpine to complete enabling works, groundworks and construction of the reinforced concrete frame to Three Chamberlain Square, Birmingham, with a value of circa £12m.

The project forms an integral part of Phase 2 of the prestigious city centre Paradise development and will create 189,000 sq ft of commercial space over 10 storeys.

The works will include the creation of a basement and the building features a large, cantilevered structure on all facades of over 1.5m at level 2 as well as a terrace at level 9.

The contract represents a continuation of MPB’s involvement at the £1.2 billion Paradise development, with the company having already worked with SRM on One Centenary Way as part of the Phase 1 works.

MORE NEWS

Navigating Results Day: Unlocking Your Career Potential Through Construction T-Levels
As you prepare to receive your examination results across the United Kingdom, evaluating your future career options is a vital step. Whether you are collecting your grades at a secondary school in Leeds, an academy in Cardiff, or a college in Glasgow, it is important to recognise that traditional academic routes are no longer your sole pathway to a rewarding profession. Technical qualifications, specifically T-Levels, have emerged as a robust alternative for you to combine academic study with practical industry experience. At MPB, we remain dedicated to supporting your future by providing clear guidance on how modern construction qualifications can establish a strong foundation for your long-term professional success.
MPB Welcomes New Procurement Policy Note Prioritising Skills in Public Contracts
MPB Structures welcomes the recent announcement from the Cabinet Office regarding the new Procurement Policy Note (PPN). Effective from January 2027, the updated framework will double the minimum social value weighting to 20 per cent on government contracts valued at £5 million or more. Most notably, the policy refines social value outcomes to two core criteria: ‘good jobs’ and ‘skills’. This structural change means that apprenticeships, training, and work placements will effectively count for double in the bidding process. As an organisation deeply committed to workforce development, we fully endorse this strategic alignment of public spending with long-term skills generation.

send us a message

"*" indicates required fields