Battersea Power Station

Based on our proven expertise and strong client relationships, MPB was appointed to design and install a complex temporary propping system for this technically demanding project.

Our team successfully supported a 14m-high single-skin brickwork façade while facilitating a 12m-deep excavation for the new basement structure. MPB’s delivery also included basement pile caps, below-slab drainage, and the permanent basement slab, all executed within a highly constrained environment.

CHALLENGES / SUCCESSES

  • The historic 14m-high brick façade was successfully preserved by installing 623 tonnes of temporary propping, which provided the essential structural stability required during the excavation phase.
  • The team managed a 12m-deep excavation on a constrained central London site, removing 55,000m³ of material while employing advanced geotechnical controls to safeguard the River Thames and surrounding structures.
  • New basement works were integrated with the historic building by using adaptive engineering to navigate legacy foundations and unknown ground conditions encountered beneath the retained façade.
  • Exceptional safety performance – achieving 344,855 safe hours worked on such a complex, high-risk engineering operation demonstrates strong safety culture, planning, and supervision.

Together, these achievements reflected a highly complex engineering operation delivered by MPB with precision, innovation, and an unwavering commitment to safety on one of the UK’s most iconic regeneration projects.

Services

Client

Skanska / Mace

Location

London

Sector

Commercial & Retail

Browse more projects

A533 Expressway Bridge

Battersea Power Station

Belfry Hotel & resort

Broadcasting Place

Bromford Tunnel West Portal

C350 Pudding Mill Lane STATION

Carrington CCGT Power Station

Chamberlain Square