Works included formation of the main turbine hall foundations, installation of all below ground drainage systems, and construction of foundations for blast-walls and associated process structures. The package was executed within a live power generation environment, requiring rigorous sequencing, quality control, and interface management across all structural elements.
The project delivered strong technical outcomes, achieving turbine block tolerances and concrete standards on first inspection. Effective interface management with the client and M&E teams ensured seamless sequencing and minimal rework. Rigorous quality control across all foundation and drainage works enabled safe, incident-free delivery of this critical infrastructure scheme.
Services
Client
JOHN SISK & SON
Location
North West
Sector