MPB Structures was appointed to deliver the civil engineering substructure package, forming the critical foundations and below ground structural elements required to support the permanent arena superstructure. The works were carried out within a highly regulated Olympic Park environment, demanding rigorous safety standards, programme certainty, and close coordination with adjacent venues and infrastructure.
The substructure was required to accommodate heavy imposed loads, long spans, and complex interfaces with steel superstructure elements, while achieving tight tolerances essential for subsequent works.
Delivering the Copper Box Arena substructure presented several technical, logistical, and programme critical challenges, which MPB Structures successfully managed through disciplined planning and engineering led delivery.