Longwood Close

The Longwood Close project was delivered using a highly coordinated, programme driven approach that relied on early planning, structured material scheduling, and the strategic use of MPB’s Generic Temporary Works designs. Key materials, including rebar, pods, formwork, and edge protection, were planned through a shared calendar system, ensuring timely deliveries across multiple live blocks and reducing delays.

CHALLENGES / SUCCESSES

The project’s success stemmed from MPB’s proactive planning, creative use of existing resources, and disciplined coordination across multiple work fronts.

  • The project presented a range of complex site constraints that required precise planning and coordinated delivery.
  • To manage the interface with Network Rail, we implemented a dual tower crane strategy that maintained programme efficiency while eliminating any risk of over sailing or compound collapse, reducing the need for direct Network Rail involvement and protecting the schedule.
  • We designed and delivered a 100 metre permanent retaining wall to enable safe excavation and ground level reduction and installed a bespoke precast retaining system to manage the level difference between the piling mat and the highway.
  • During basement construction, our robust excavation methodology safeguarded the adjacent road, ensured public safety and maintained uninterrupted progress.

Through early planning, innovative methods, and a disciplined team structure, MPB successfully delivered Longwood Close with strong programme adherence, improved efficiency, and consistently high standards across all work stages.

Services

Client

McLAREN

Location

West Midlands

Sector

Student Accommodation

Browse more projects

A533 Expressway Bridge

Battersea Power Station

Belfry Hotel & resort

Broadcasting Place

Bromford Tunnel West Portal

C350 Pudding Mill Lane STATION

Carrington CCGT Power Station

Chamberlain Square