The scheme involved constructing a major new structure spanning the M6, formed of two 40-metre spans supported by 80-metre long abutments and a central pier built within live traffic management in the central reserve. MPB delivered all structural concrete works, placing over 6,500m³ of concrete, including a 750m³ continuous pour completed in just 12 hours during a planned motorway closure, a critical milestone achieved through meticulous planning and flawless execution.
MPB supplied all permanent and temporary materials for the FRC works and undertook all associated temporary works design, including CAT III checked formwork systems and AIPs, reflecting the stringent safety and engineering requirements of working adjacent to live motorway traffic.
Together, these achievements showcase MPB’s ability to solve complex engineering challenges and deliver high‑risk, precision led works safely, efficiently, and without disruption.
Services
Client
Amey SRM JV
Location
North West
Sector