Works began with demolition, followed by an extensive temporary works and excavation phase to safely construct the new basement structures near a Network Rail viaduct. MPB completed 18,780 m³ of earthworks, installed large temporary propping systems, and delivered two slipform cores at 27.5 m and 118 m. The tower, supported by over 16,000 m³ of concrete, 2,246 tonnes of rebar, post tensioned slabs, and two tower cranes up to 120 m in height. MPB’s scope covered demolition, sheet piling, piling attendance, basements, substructure, slipform, drainage, superstructure, and site logistics.
By anticipating these risks early and applying disciplined engineering, MPB delivered a complex, multi-use development with confidence, reinforcing our reputation as the contractor clients trust when performance, precision and reliability are non-negotiable.
Through proactive planning, safe execution, and strong collaboration with stakeholders, MPB Structures delivered the Miles Street project efficiently while overcoming technical, logistical, and external challenges.
Services
Client
DOWNING
Location
LONDON
Sector