The River Rea overflow structure is a major piece of infrastructure, designed to safely divert the existing watercourse that runs alongside the future HS2 track alignment. This impressive 450 m long reinforced concrete, water retaining structure not only redirects the river but also provides approximately 15,000 m³ of strategic water storage, significantly reducing flood risk to the new railway assets.

At both the inlet and outlet, the new structure interfaces seamlessly with historic Victorian infrastructure, demonstrating MPB’s ability to integrate modern engineering solutions with legacy systems while maintaining the highest standards of quality and safety.

CHALLENGES / SUCCESSES

  • Delivery of all works within a fully sheet piled and propped excavation, ensuring safe and efficient progress.
  • Successful execution of complex reinforced concrete geometry, demonstrating high level technical expertise.
  • Proactive management of an active watercourse to maintain flow and protect the environment throughout construction.
  • Precision installation of a haunched dry weather channel integrated seamlessly within the new structure.
  • Controlled demolition of existing Victorian culverts to achieve a clean, accurate tie-in to the new asset.

Together, these accomplishments demonstrate MPB’s ability to deliver intricate, safety‑critical civil engineering works with exceptional precision, technical excellence, and complete operational control.

Services

Client

Balfour Beatty Vinci JV

Location

West Midlands

Sector

Water

Browse more projects

A533 Expressway Bridge

Battersea Power Station

Belfry Hotel & resort

Broadcasting Place

Bromford Tunnel West Portal

C350 Pudding Mill Lane STATION

Carrington CCGT Power Station

Chamberlain Square