MPB completed the civil engineering package of works on behalf of Volker Rail at Wigan Springs Branch Depot. The package of works included the construction of 5no 100m long concrete aprons, the construction of a new car park and the installation of deep drainage and attenuation in a railway environment.
The drainage works included all surface water and foul water drainage for the new depot, constructing a new 3m diameter manhole onto a live sewer and the installation of a 5m deep attenuation tank in a sheet piled cofferdam directly adjacent to the up goods line of the West Coast Main Line.
The carpark installation included the installation of kerbs, drainage, surfacing and white lining. A new bell mouth was also installed as part of the works.
This scheme showcased MPB’s strength in delivering complex civil engineering within high‑risk, tightly constrained environments